Skip to content
GorbLab Engineering

GorbLab Engineering

  • Home
  • Services
  • Projects
  • Vintage Repair
  • About
  • Blog
  • Contact

IFA 2026 was the biggest one yet

11 November 202615 September 2026
IFA 2026 was the biggest one yet

240,000 visitors, more than 2,000 exhibitors, and robots in almost every hall.

Categories News

Noise cancelling is now the cheap option

11 November 202614 September 2026
Noise cancelling is now the cheap option

Apple put active noise cancellation in both AirPods 5 models, including the $129 one.

Categories News

Memory is now more than half the chip market

7 September 20265 September 2026
Memory is now more than half the chip market

DRAM revenue up 246%, NAND up 372%, and memory at 54% of all semiconductor revenue. What that does to a bill of materials.

Categories News

Chip sales passed $400 billion in a single quarter

7 September 20263 September 2026
Chip sales passed $400 billion in a single quarter

Global semiconductor sales reached $403.3 billion in Q2 2026 — and the queue behind that number is what matters to anyone specifying parts.

Categories News

Europe’s Dresden fab moves from concrete to equipment

31 August 2026
Europe’s Dresden fab moves from concrete to equipment

ESMC — TSMC with Bosch, Infineon and NXP — is fitting out its Dresden plant, targeting 40,000 wafers a month from 2027.

Categories News

The 2 nm node is sold out before most people have seen it

28 August 2026
The 2 nm node is sold out before most people have seen it

TSMC N2 entered volume production and its capacity is reportedly spoken for through 2026, largely by AI silicon.

Categories News

Gartner puts the 2026 chip market at $1.6 trillion

7 September 202626 August 2026
Gartner puts the 2026 chip market at $1.6 trillion

A 92% jump in a single year, with AI data centre silicon accounting for more than a third of all semiconductor revenue.

Categories News

Designing something that can actually be repaired

21 August 2026
Designing something that can actually be repaired

With EU repair rules now in force, serviceability has become a design requirement. Most of it costs nothing at schematic stage.

Categories Engineering Notes

How to read a quoted lead time

21 August 2026
How to read a quoted lead time

A distributor quoting 40 weeks is telling you several different things at once. Here is how to tell which.

Categories Engineering Notes
Older posts
Newer posts
← Previous Page1 Page2 Page3 Page4 Page5 Next →

© 2026 GorbLab Engineering · Netherlands · Privacy Policy